RFQ quality control

Know what's wrong
before you quote.

Upload the drawings, BOM, specs and customer email. Missing requirements, conflicting values and revision problems are found before they reach your estimator.

Drop your RFQ package here

Drawings · BOM · Specs · Email

or drag and drop

    · Browse sample reports

    No signup, no sales call. Up to 12 files, 10 MB each. Files are deleted once the report is built.

    Prefer to start smaller? Paste the email instead
    RFQ-5502 · Summit Process Systems 11 files · 4 parts · analysed 18 September Needs review4 critical · 2 missing · 8 warnings
    Files11
    Parts4
    Critical4
    Missing2
    CriticalQuantity conflict on BR-5501
    Email · line 13
    500 pcs
    BOM · row 2
    250 pcs
    Source: RFQ-5502-cover.txt · Line 13
    BR-5501 Rev B - 500 pcs total
    Source: BOM-5502.xlsx · Sheet Parts, row 2
    BR-5501 | B | 250 | A36 STEEL | 0.250 in | PAINT PER SPEC

    A real finding from the messy-package sample, in the report's own layout. Both statements stay visible and neither is picked — a value only reaches a report when it can be found verbatim in the file it is cited to.

    01

    AI extracts

    It may only claim a value it can quote back, verbatim, from the segment it was read in. Anything it cannot cite does not exist.

    02

    Software checks

    Missing fields, conflicting values and superseded revisions are found by ordinary TypeScript. The model does not get a vote on what is wrong.

    03

    You decide

    What governs, what gets quoted and whether the job is worth taking at all stay with the estimator.

    None of it is a judgement about whether to quote. That is yours, and it is the reason the report shows its work instead of handing you an answer.

    See what it catches

    01Quantity conflict
    CriticalBR-4401 · Harbor Point Marine
    Email · line 13
    600 pcs
    BOM · row 2
    250 pcs

    The same part, quoted at two different quantities in two files that arrived in the same package. Neither value is treated as the answer — both sources stay visible, and the report will not pick one for you.

    Source → RFQ-7712-email.txt · line 13
    BOM-7712.xlsx · sheet Parts, row 2

    02Revision mismatch
    CriticalBR-3301
    Email
    Rev D
    BOM + drawing
    Rev C

    The package carries conflicting revisions and does not say which governs.

    Source → RFQ-3390-email.txt · line 15
    BR-3301-RevC.pdf · page 1

    03Missing requirement
    MissingGR-8801
    Material
    —
    Revision
    —

    Reported as absent, never guessed from the drawing sitting next to it.

    Source → GR-8801.pdf · "MATERIAL: NOT SPECIFIED ON THIS SHEET"

    Every finding has a source.

    BOM-5502.xlsx · sheet Parts · row 2

    BR-5501 | B | 250 | A36 STEEL | 0.250 in | PAINT PER SPEC
    CriticalQuantity conflict on BR-5501

    500 pcs ≠ 250 pcs

    The email says 500 and the BOM says 250. Both are shown. You decide which one governs.

    No value is inferred and nothing is merged. A value reaches the report only when the quoted text appears verbatim in the segment it is cited to — otherwise the field shows a dash.

    How it works

    01

    Upload

    Drop in the RFQ package, or paste the customer's email straight in.

    02

    Extract

    Requirements are pulled out of each file, each with a citation.

    03

    Cross-check

    Conflicts, revision mismatches and missing fields are compared.

    04

    Review

    Every finding points back to the line it came from.

    The extraction contract and every check behind these steps are written out on how it works.

    What it checks

    Six ways a package goes wrong

    Every one of these is a rule in the published list — published rather than hidden, so you can read what gets checked before you trust a report.

    01

    Missing information

    Requirements that are referenced but never actually defined.

    02

    Conflicting information

    The same field stated two different ways in two different files.

    03

    Revision mismatch

    Drawings, the BOM and the email disagreeing about which revision governs.

    04

    Ambiguity

    Wording that can honestly be read two ways and cannot be checked from the package.

    05

    Attachment problems

    Unreadable files, empty exports, duplicates, and supporting material that is simply absent.

    06

    Part-level issues

    Findings scoped to the part they affect, rather than condemning the whole package.

    Want to see it in action?

    Five fictional packages, each built around one real failure mode. Open the report any of them produces — nothing is charged and no signup is needed.

    Explore sample reports →

    Your RFQs stay private.

    Uploaded files are read once and deleted from storage as soon as the report is built — on failure as well as success. The report itself expires, and you can delete it from its own page at any time.

    Read how files are handled

    Priced per package.

    5packages a month, free — every check, every export

    then

    $9per package, with no seats and no annual contract

    No card is collected anywhere on this site, and everything stays free while the service is in preview. See the pricing detail.

    Ready to check your next RFQ?

    It will not quote, will not price, will not tell you whether to bid, and will not read a CAD solid. It checks the package in front of you and shows you where the problems are. No signup.

    Upload RFQ package